Bored cast-in-situ piles
Rotary bored piles from Ø500mm to Ø1500mm, taken to the founding level in the approved design. Our MAIT HR-180 handles the largest diameters in dense soil and rock.
Services · Infrastructure · Pile foundation
Bored cast-in-situ piles from Ø500mm to Ø1500mm in soil, weathered rock and hard rock, drilled with our own rotary rigs, and the pile caps that tie them together. We take on construction piling work for bridges, metro viaducts, highway structures, treatment plants and buildings.
A service by Kaveri Constructions, Bengaluru. Used on NHAI, BMRCL, BBMP, BWSSB, KRDCL and KNNL projects.
The basics
A pile foundation is a deep foundation that carries a structure's load down through weak or compressible soil to a stronger layer or to rock, using long columns of concrete or steel called piles. A group of piles is tied together at the top by a pile cap, and the column or bridge pier sits on that cap.
Engineers specify piles when the soil near the surface can't carry the load without settling. River crossings, flyovers, metro viaducts and heavy buildings on filled or soft ground all fall into that group, as does any site where the soil report shows soft layers over rock.
Our pile foundation services cover the part that's hardest to get right on site: boring the hole to the founding level the design asks for, keeping it stable, and filling it with sound concrete.
What's included
Hire us for the full pile works package, or for boring alone where your team handles the rest.
Rotary bored piles from Ø500mm to Ø1500mm, taken to the founding level in the approved design. Our MAIT HR-180 handles the largest diameters in dense soil and rock.
When rotary drilling slows in hard rock, tripod chiselling systems take over. We've bored through soil and hard rock on the Krishna River bridge and Kottapalli–Masti Road Bridge No. 173.
Steel liners hold the top of the bore where the strata is loose or waterlogged, and polymer drilling slurry keeps the rest of the bore open until it's concreted.
Cages are lowered into the bore with our TATA TFC-75 crawler crane, and concrete is placed from the bottom of the bore upwards so it pushes the slurry out.
Pile heads are cut down to level and a reinforced concrete cap is cast over each group, ready for the column, pier or abutment above. See our bridge construction services for the substructure on top.
Cube compressive strength tests, ultrasonic testing, and stage-wise inspection of bores, cages and concreting, with the records in a handover file.
Types of piling
Pile foundation types are usually sorted three ways: by how the pile carries its load, by how it goes into the ground, and by what it's made of. The type a designer picks depends on the soil, the load, the water table and what stands next to the site.
The pile passes through weak soil and rests on rock or a hard stratum. Most of the load goes through the tip, much like a column standing on rock. Common on bridges and river crossings.
Where hard strata is too deep to reach, the pile carries load through friction between its shaft and the surrounding soil. Longer and wider piles give more surface to work with.
Most real piles use both: friction along the shaft and bearing at the tip. Designers count on each in proportion to the ground the pile passes through.
Some piles resist uplift or sideways forces rather than downward load, as under tall towers, retaining structures and bridge abutments.
| Type | How it's built | Suits | Watch out for |
|---|---|---|---|
| Bored cast-in-situ (our service) | A hole is drilled with a rotary rig, a reinforcement cage is lowered, and concrete is placed in the hole. | Heavy loads, large diameters, rock, and urban sites where vibration matters | Needs careful bore cleaning and concreting control |
| Driven precast | Factory-made concrete piles are hammered into the ground. | Soft soils and sites where noise is acceptable | Vibration, and hard layers can stop the pile short |
| Driven cast-in-situ | A steel casing is driven, filled with concrete, and withdrawn or left in place. | Medium loads in soft to medium soils | The same vibration limits as other driven piles |
| Under-reamed | A short bored pile with one or more bulbs widened near the base. | Light structures on expansive black cotton soil | Not meant for heavy bridge or metro loads |
| Steel H-piles and tubes | Rolled steel sections driven or vibrated into the ground. | Marine structures, temporary works and deep soft deposits | Corrosion protection over the design life |
| Micropiles | Small-diameter drilled piles, grouted in place. | Tight access and underpinning existing buildings | Low capacity per pile, so many are needed |
Concrete piles, bored or precast, carry most of India's foundation work. Steel piles turn up on marine and temporary works, and timber piles are now rare. Of all these types of piling, our service is bored cast-in-situ concrete piling, the type most often specified for bridge, metro and highway structures in India.
Deep or shallow
Building the foundations starts with one question: can the soil just below the structure carry the load? If it can, an open footing or a raft is cheaper and quicker. If it can't, the load goes down into piles, and piling footings are the usual answer: the column sits on a pile cap over a group of piles.
| Foundation | How it carries load | Usually chosen when |
|---|---|---|
| Open (isolated) footing | Spreads a column load over a pad of concrete just below ground. | Firm soil near the surface and moderate loads |
| Raft foundation | One thick slab under the whole structure spreads the load wide. | Softer soil and evenly spread loads, such as basements |
| Piling footings (pile cap on piles) | The pile cap passes the load into piles that reach a stronger layer. | Weak or filled soil, heavy or concentrated loads, water, scour or uplift |
The decision belongs to your structural and geotechnical engineers. Our job is to build what they design, and to flag early if the ground on site differs from the soil report.
How we build them
Every bored pile on our sites goes through the same sequence, and we run each stage with our own rigs.
Set-out. The pile position is surveyed and marked from the approved pile layout.
Liner. A steel liner is set into the top of the bore to hold loose or waterlogged ground.
Boring. The rotary rig drills down under polymer drilling slurry, which keeps the bore walls from collapsing.
Rock. Where rotary drilling slows in hard rock, tripod chiselling takes the bore on to founding level.
Cleaning and depth check. The base of the bore is cleaned and the depth is checked against the design before anything goes in.
Cage. The reinforcement cage is lowered by crane and held at the right level.
Concrete. Concrete goes in through a tremie pipe from the bottom up, pushing the slurry out of the bore as it rises.
Liner removal and curing. Temporary liners are withdrawn and the pile is left to gain strength.
Cut-off and records. The weak concrete at the top is broken down to cut-off level, and the test results go into the handover file.
Pile caps
A single pile rarely carries a column or pier on its own. A pile cap is a thick block of reinforced concrete cast over the heads of a pile group, so the load from above spreads across every pile beneath it.
The number of piles under a cap comes from the design load. Small columns may sit on two or three piles, while bridge piers often stand on caps over six piles or more.
Where we work
Ø1000mm and Ø1200mm piles in soil and hard rock across the Krishna River at Hippargi, for Bridge No. 173 on the Kottapalli–Masti Road, and for the LC No. 40 bridge on Mysore Road in Bengaluru.
Ø1200mm and Ø1500mm piles at Km 123+949 and the interchange ramps on the Bangalore–Chennai Expressway, under APCO Infratech for NHAI.
Ø1200mm piling with polymer tanks on Namma Metro Reach-1B and the Whitefield depot line, under M. Venkata Rao Infra Projects for BMRCL.
Ø500mm piling for the 10 MLD sewage treatment plant and 13 MLD TSPS at Kommaghatta, Bengaluru, under KBR Infratech for BWSSB.
We also take on pile foundations for building projects where the structural design calls for piles. For piling on highway structures, see our road and highway construction services.
Track record
On each job, we worked under the main contractor named, for the client authority listed.
| Project | Location | Pile works | Main contractor | Client |
|---|---|---|---|---|
| Bangalore–Chennai Expressway, Km 123+949 and interchange ramps | Palamaner, Andhra Pradesh | Deep bored piles, Ø1200mm and Ø1500mm | APCO Infratech | NHAI |
| Bridge across the Krishna River near Hippargi | Bagalkot, Karnataka | Pile boring, Ø1000mm and Ø1200mm, soil and hard rock | Udayshivakumar Infra / Venkateshwar Constructions | KNNL |
| Bridge No. 173 at Km 44.70, Kottapalli–Masti Road | Kolar, Karnataka | Rotary pile boring, Ø1200mm, soil and hard rock | BSR Infratech | KRDCL |
| Bridge at LC No. 40, Gopalan Arcade to Mysore Road | Bengaluru, Karnataka | Piling Ø1000mm and Ø1200mm, reinforcement, liners and concreting | Imperial Constrafin | BBMP |
| Namma Metro Reach-1B and Whitefield depot line | Bengaluru, Karnataka | Piling Ø1200mm with polymer tanks | M. Venkata Rao Infra Projects | BMRCL |
| 10 MLD STP and 13 MLD TSPS, Kommaghatta | Bengaluru, Karnataka | Piling Ø500mm | KBR Infratech | BWSSB |
The full list is on our projects page, with case studies on the Krishna River bridge and the Bangalore–Chennai Expressway piling.
Plant and machinery
A piling programme lives or dies on rig availability. Ours are owned, so they start when the programme says.
High-torque rig for deep bored piles up to Ø1500mm in dense soil, weathered rock and bedrock.
Medium-capacity rig that moves easily around highway and bridge foundation sites.
Compact rig for urban sites, metro alignments and work close to existing buildings.
Lowers reinforcement cages, drives temporary liners and handles staging on site.
Plus tripod chiselling systems for boring through hard rock.
Before you award the work
Ask for the make, model and current location. Rig size limits the diameter and depth a contractor can reach. Ours are the MAIT HR-180, MAIT HR-130 and SOILMEC SR-30.
Boring in hard rock is slower and needs chiselling equipment. Ask for a project in similar strata, then call the main contractor on it.
Liners, polymer slurry or bentonite: the method should match the soil report and the water table on your site.
Cage and concreting records, cube results and test reports should come with the piles, not weeks later.
Quality
We work to the approved pile design and to MoRTH, IRC and BMRCL specifications on infrastructure jobs. Bores, cages and concreting are inspected stage by stage, concrete is cube-tested, ultrasonic testing checks concrete quality, and the handover file carries the records.
FAQ
A pile foundation is a deep foundation that carries a structure's load through weak soil to a stronger layer or rock, using long concrete or steel columns called piles. A pile cap ties each group of piles together under the column or pier.
By load: end-bearing, friction and combined piles. By installation: bored cast-in-situ, driven precast, driven cast-in-situ, under-reamed, steel and micropiles. By material: concrete, steel and timber.
None is best everywhere. Bored cast-in-situ piles suit heavy loads, rock and urban sites where vibration matters. Driven piles are quick in soft soils where noise is acceptable. Under-reamed piles suit light buildings on expansive soil. The soil report and design load decide.
Piling footings are foundations where a column or pier sits on a pile cap supported by piles, instead of on an open footing. They're used when the soil near the surface can't carry the load.
A pile cap is a thick reinforced concrete block cast over the heads of a group of piles. It spreads the load from the column or pier above across all the piles beneath it.
When the soil near the surface is soft, loose or filled; when the structure is in or near water; when loads are heavy and concentrated; or when the foundation has to resist uplift or sideways forces. Your geotechnical report will show which applies.
They cost more and take longer than shallow foundations, need specialist rigs and testing, and driven piles cause noise and vibration. Bored piles also need tight control of bore cleaning and concreting to avoid defects.
Ø500mm to Ø1500mm bored cast-in-situ piles, in soil, weathered rock and hard rock.
Yes. Our rotary rigs bore through weathered rock, and tripod chiselling systems take over in hard rock. We've done this on the Krishna River bridge and Kottapalli–Masti Road Bridge No. 173.
Yes. Alongside bridges, metro and highway structures, we take on pile foundations for building projects where the structural design calls for piles.
The soil investigation report, the pile layout and schedule with diameters, depths and numbers, structural drawings, site location and your target programme. Email Kavericonstruction22@gmail.com or call +91 84959 52555, Monday to Saturday, 10am to 6:30pm.
Related services
Piled foundations, substructures and girder work for bridges.
Widening, pavement, paved shoulders, drains and structures.
Factories, warehouses and PEB civil works with industrial flooring.
Further reading
Site information, construction stages and quality checks for bored cast-in-situ piling.
Read the guideWork stages, pavement choices and package planning for road and highway projects.
Read the guideA practical guide to scope, drawings, approvals and programme before work begins.
Read the guideLet’s build together
Share the soil report, pile layout and programme. We’ll review the ground conditions, rig plan and construction scope.