Foundations and piling
Footings and machine bases, and bored piles from Ø500mm to Ø1500mm with our own rigs where the soil needs them. See our pile foundation services.
Services · Industrial · Factories and warehouses
We build factories, warehouses, PEB sheds and plant buildings for manufacturers and developers in Karnataka: foundations and machine bases, industrial flooring, RCC structures, and the civil works under pre-engineered steel buildings.
A service by Kaveri Constructions, Banashankari, Bengaluru. Backed by the QA/QC we run on NHAI, BMRCL and BBMP infrastructure work.
Industrial buildings
In factory construction and in warehouses, the floor does more work than anything else. Racking, forklifts and machines put heavy point loads on it every day, and a floor that cracks or settles stops operations.
Most industrial sheds in India are pre-engineered buildings, or PEB construction: a steel frame and roof made in a factory and bolted together on site. The PEB supplier designs and erects the steel. We build what it stands on: the foundations, anchor bolts, pedestals, plinth, floors and the civil works around it.
Requirements
These are the parts of a factory or warehouse that change how it gets built.
| Element | What the building needs |
|---|---|
| Industrial floors | Thick concrete floors with the right reinforcement, joints and surface hardener for forklifts and racking. |
| Foundations and machine bases | Footings for the steel frame, and separate bases for heavy or vibrating machines. |
| PEB interface | Anchor bolts and pedestals set accurately so the steel frame bolts down first time. |
| Clear height and docks | Clear internal height for racking and cranes, and dock levellers at truck height. |
| Drainage and roads | Stormwater drains, internal roads and hardstands for heavy vehicles. |
| Utilities | Space for transformers, compressors, effluent treatment and fire water tanks. |
What's included
We work as industrial building contractors for the civil package of PEB sheds and industrial shed construction, RCC industrial structures, or site works around an existing plant.
Footings and machine bases, and bored piles from Ø500mm to Ø1500mm with our own rigs where the soil needs them. See our pile foundation services.
Pedestals, anchor bolts, plinth beams and grade slabs built to the PEB supplier's drawings, ready for steel erection.
Reinforced concrete floors with the joints and hardeners specified for your loads and traffic.
Multi-storey RCC buildings, mezzanines, utility blocks and plant rooms.
Internal roads, hardstands and stormwater drains, drawing on our road and highway work.
Foundations and structures for treatment plants, tanks and pump houses. We bored the piles for a 10 MLD sewage treatment plant and pumping station for BWSSB.
Pre-engineered buildings
A pre-engineered building (PEB) splits the work between the steel supplier and the civil contractor. Getting that split clear before you sign avoids the most common delay on PEB sheds: steel arriving at a site that isn't ready.
| Work | PEB supplier | Civil contractor (us) |
|---|---|---|
| Design | Designs the steel frame, roof and wall sheeting, and gives the foundation loads. | Builds the foundations your structural engineer designs for those loads. |
| Foundations and anchor bolts | Supplies the anchor bolt layout and templates. | Casts pedestals and foundations with anchor bolts set to the layout. |
| Steel frame and sheeting | Fabricates, delivers and erects columns, rafters, purlins and sheeting. | Keeps the site clear and accessible for cranes and erection crews. |
| Floor and plinth | Not in their scope. | Builds the plinth, grade slab and industrial floor, usually once the roof is on. |
| Site works | Not in their scope. | Roads, drains, hardstands, compound walls and utility trenches. |
Industrial flooring
Industrial flooring is where factory and warehouse projects most often go wrong. A good floor comes down to a few decisions made before the first pour:
Industrial shed construction cost
Warehouse construction cost per sq ft and industrial shed construction cost depend on what the building has to carry and how tall it is. These move the number most:
How we work
Review. We go through your drawings, bill of quantities, soil report and programme, and visit the site.
Plan. You get a written method, a construction programme and a rate for the agreed scope.
Build. Work goes ahead with stage-wise inspection, cube tests on concrete and regular progress reports.
Hand over. Inspection and test records come to you in one file, ready for your approvals.
Before you sign
Ask about slab thickness, joints, curing and the flatness they can achieve for your racking.
Anchor bolts out of position delay steel erection. Ask how they're checked before concreting.
Industrial sites on fill or soft soil may need piles. Ask whether they bore piles themselves.
For expansions, ask how they'll keep production, deliveries and the site apart.
Why Kaveri
Stage-wise inspection, cube tests and ultrasonic testing are standard on our NHAI and metro jobs, and on every building we take on.
MAIT HR-180, MAIT HR-130 and SOILMEC SR-30 rigs and a TATA crawler crane, owned rather than hired, for difficult ground.
19+ projects since 2021 for NHAI, BMRCL, BBMP, BWSSB, KRDCL and KNNL, working with Tier-1 contractors.
Founded in 2021 by Kiran Kumar K, we work out of Banashankari 2nd Block, Bengaluru, Monday to Saturday.
FAQ
Foundations and piling, PEB civil works, industrial flooring, RCC industrial structures, roads, drains and yards, and plant and utility works.
A PEB shed is a pre-engineered building: a steel frame and roof designed and made in a factory, then bolted together on site. The PEB supplier provides and erects the steel, and a civil contractor builds the foundations, pedestals, floors and site works.
No. The PEB supplier designs and erects the steel. We build the civil works it stands on and coordinate with the supplier so the steel arrives to a ready site.
It depends on the floor specification, clear height and span, foundations, docks and site works. We quote the civil package from your drawings and the PEB supplier's foundation loads.
Yes. We build multi-storey RCC factory buildings, mezzanines, utility blocks and plant rooms, as well as civil works for steel buildings.
The right thickness and reinforcement for your heaviest loads, a well-compacted sub-base, a sensible joint layout, a hard-wearing surface finish and proper curing.
Layout and structural drawings, the PEB supplier's foundation loads if you have them, the bill of quantities, the soil report, site location and programme. Email Kavericonstruction22@gmail.com or call +91 84959 52555.
Related services
Bored piles Ø500–1500mm in soil and rock, with our own rigs.
Widening, pavement, paved shoulders, drains and structures.
Piled foundations, substructures and girder work for bridges.
Further reading
Planning the structure, services and finishes for commercial buildings.
Read the guideA practical guide to scope, drawings, approvals and programme before work begins.
Read the guideHow clear communication, records and site coordination help a construction project run smoothly.
Read the guideLet’s build together
Send the drawings, bill of quantities and programme. We'll review the scope and come back on method, programme and rate.