Services · Infrastructure · Bridges and flyovers

Bridge construction services, from the pile up.

Foundation and substructure work for new bridges, flyovers and river crossings. We bore piles from Ø500mm to Ø1500mm in soil and hard rock with our own rigs, then build the pile caps, piers, pier caps and girders that sit on them.

A service by Kaveri Constructions, Bengaluru. Used on NHAI, KRDCL, KNNL and BBMP projects.

Ø500–1500Pile diameters, mm
3 + 1Owned piling rigs + crawler crane
7Bridge, viaduct and underpass jobs
8+Authorities and Tier-1 clients

What's included

Our bridge construction services, stage by stage.

Hire us for the full foundation and substructure package, or for a single stage such as piling.

Bored pile foundations for bridges

Rotary bored piles from Ø500mm to Ø1500mm in soil, weathered rock and hard rock. Polymer drilling slurry holds the bore open, and steel liners go in where the top strata is loose or waterlogged. When rotary drilling slows in hard rock, tripod chiselling takes over. More detail is on our pile foundation work page.

Pile caps, piers and abutments

Once the piles are cut to level and checked, we cast pile caps, then piers and abutments to the approved general arrangement drawing (GAD). Reinforcement, shuttering and levels are inspected stage by stage before concrete goes in.

Pier caps, RCC girders and staging

Heavy pier caps, precast and cast-in-situ RCC girders, and the long-span staging and formwork they need. Our TATA TFC-75 crawler crane handles reinforcement cages, temporary liners and girder staging on site.

Flyovers, ROBs and railway underpasses

For flyover bridge construction in built-up areas, piling has to fit around traffic, utilities and railway blocks. The SOILMEC SR-30 rig in our fleet is sized for these tight urban sites.

River bridges

Piling in riverbeds and over falls, including the Krishna River bridge at Hippargi and the Ganeshpal Falls bridge in Uttara Kannada. River work is sequenced around water levels and the monsoon, because a flooded bore costs more than a late start.

Box culverts and minor bridges

Cross-drainage structures on highway widening packages, built alongside the road and highway work we already handle on two-lane and four-lane corridors.

Who it's for

Bridge contractors for EPC companies and departments.

EPC and main contractors

You have the bridge package and a tight programme. We take the piling and substructure with our own rigs, so the deck crew isn't left waiting. We've worked under APCO Infratech, BSR Infratech, Imperial Constrafin, Udayshivakumar Infra, BSG Infrastructure and M. Venkata Rao Infra Projects.

Departments and developers

Planning new bridge construction? Talk to us before the design is frozen. Choosing pile type and founding level with the ground in mind saves more time than anything we can do once we're on site.

How it works

How our bridge construction service works.

  1. Send the drawings

    GAD, soil investigation report, pile schedule or BOQ, location and target programme.

  2. Site and soil review

    We check access, strata and water levels against the drawings.

  3. Method, rig plan and rate

    You get a written method, the rigs we'll deploy and a rate for the scope.

  4. Mobilise

    Owned rigs and crane move to site on the agreed date.

  5. Build and inspect

    Stage-wise inspection, cube tests and progress records.

  6. Handover

    Test results and inspection records in one file.

Flyover construction

Flyover bridge construction, step by step.

A flyover is a bridge that carries one road over another road, a junction or a railway line. Flyover construction follows the same order as most concrete bridges. The difference is that it happens above live traffic, so every stage needs a diversion plan, a safe working strip and tight control over when heavy plant moves.

This is the usual sequence on an Indian flyover project:

  1. Survey, boreholes and utility shifting. Soil investigation fixes the founding levels. Water mains, sewers, power and telecom lines in the alignment are moved first, and in cities this is often the slowest stage.

  2. Barricading and traffic diversion. The median or one carriageway becomes a fenced working strip, with diversions agreed with the traffic police.

  3. Piling. Bored piles go down at every pier and abutment location.

    Our scope
  4. Pile caps and piers. A cap ties each pile group together, and the pier rises from it to design height.

    Our scope
  5. Pier caps. These are cast on staging at the top of each pier to carry the girder bearings.

    Our scope
  6. Girders. Precast girders are cast in a yard and lifted onto the bearings, or cast in situ on staging where lifting isn't practical.

    Our scope
  7. Deck slab, crash barriers and expansion joints go on top of the girders.

  8. Approach ramps, usually reinforced earth walls, bring traffic up to deck level at each end.

  9. Wearing coat, drainage, lighting and a load test come last, before the flyover opens.

Our flyover construction service covers stages 3 to 6: piling, pile caps, piers, pier caps, and RCC girders with their staging. The main contractor usually takes the deck, approaches and road finishing.

Track record

Bridge work we've delivered.

On each job, we worked under the main contractor named, for the client authority listed.

ProjectLocationOur workMain contractorClient
Bridge No. 173 at Km 44.70, Kottapalli–Masti RoadKolar, KarnatakaRotary pile boring, Ø1200mm, soil and hard rockBSR InfratechKRDCL
Bridge across the Krishna River near Hippargi, Jamkhandi–Athani RoadBagalkot, KarnatakaPile boring, Ø1000mm and Ø1200mm, soil and hard rockUdayshivakumar Infra / Venkateshwar ConstructionsKNNL
Bridge at LC No. 40, Gopalan Arcade to Mysore Road (RR Nagar, Ward 160)Bengaluru, KarnatakaPiling Ø1000mm and Ø1200mm, reinforcement, liners and concretingImperial ConstrafinBBMP
Bangalore–Chennai Expressway, Km 123+949 and interchange rampsPalamaner, Andhra PradeshDeep bored piles, Ø1200mm and Ø1500mmAPCO InfratechNHAI
Bridge across Ganeshpal Falls, Hittalahalli, Yellapur talukUttara Kannada, KarnatakaBridge works on tenderer's turnkey designBSG Infrastructure, DharwadKRDCL
Railway underpass, ChikkabanavaraBengaluru, KarnatakaGrade separator and approach structuresParmanand AdwaniMinistry of Railways
Namma Metro Reach-1B and Whitefield depot lineBengaluru, KarnatakaViaduct piling, Ø1200mm, with polymer tanksM. Venkata Rao Infra ProjectsBMRCL

The full list, including highway, metro and sewage treatment work, is on our projects page. The Krishna River bridge and the Bangalore–Chennai Expressway piling each have a full case study.

Plant and machinery

Rigs we own, not hire.

Our owned fleet supports bridge foundation packages. Equipment deployment is planned around the scope, ground conditions and programme:

  • MAIT HR-180 rotary piling rig for deep bored piles up to Ø1500mm in dense soil, weathered rock and bedrock.
  • MAIT HR-130 rotary piling rig for highway and bridge foundations where the site is tighter.
  • SOILMEC SR-30 hydraulic rig sized for urban sites, metro alignments and work close to existing structures.
  • TATA TFC-75 crawler crane for lowering reinforcement cages, driving temporary liners and girder staging.
  • Tripod chiselling systems for boring through hard rock.

Quality

Checked at each stage. Documented at handover.

Inspection and testing follow the approved drawings and applicable project specifications, with requirements agreed for each package. On site, that means:

  • Cube compressive strength tests on the concrete going into piles, caps and piers.
  • Coordinate the concrete and pile testing specified for the project.
  • Inspection of bores, reinforcement cages and shuttering before concrete is placed.
  • A handover file with test results and inspection records for the main contractor or department.

Before you award the work

Hiring a bridge construction company in India? Ask four things.

Do they own their rigs?

Ask for the make, model and where each rig is today. A contractor relying on hired rigs can't commit to a start date. We own three piling rigs and a crawler crane.

Have they bored in ground like yours?

Soil piling and hard rock piling are different jobs, so ask for a project in similar strata. Ours include hard rock piling on the Krishna River bridge and Kottapalli–Masti Road Bridge No. 173.

Who have they worked under?

Tier-1 EPC companies check their subcontractors before handing over a bridge package, and every name on a project register can be verified with a phone call.

What paperwork comes with the work?

Cube results, pile records and inspection sheets should arrive with the work, not after weeks of follow-up.

Service area

Where we provide this service.

Our team works out of Banashankari 2nd Block, Bengaluru. This service has taken us to Kolar, Bagalkot, Uttara Kannada and Bengaluru in Karnataka, and Palamaner and Naidupeta in Andhra Pradesh, with highway work in Tamil Nadu. We take on bridge packages in other states where the scope and programme fit our fleet.

FAQ

Bridge construction services, answered.

What's included in your bridge construction services?

Bored piles from Ø500mm to Ø1500mm, pile caps, piers and abutments, pier caps, RCC girders with staging, and box culverts and minor bridges. You can hire us for the full package or a single stage such as piling.

What do bridge construction companies usually handle themselves?

On large projects, the main EPC contractor manages design coordination, the deck and the road works, and often hands piling and substructure to specialist bridge contractors. That's the service we provide.

What is the difference between a flyover and a bridge?

A flyover is a type of bridge. "Bridge" covers any structure that carries a road or railway over an obstacle such as a river or valley. A flyover carries a road over another road or a junction. A road over bridge (ROB) carries a road over a railway line.

How long does bridge construction take?

The programme depends on the number of spans, pile depth, ground conditions, water levels and site access. Share the drawings and soil report so we can review a schedule for our agreed package.

How much does flyover construction cost in India?

There's no reliable flat rate. Cost depends on span lengths, the number of piers, pile depth, utility shifting and traffic management. For piling and substructure, we price from the GAD, soil investigation report and pile schedule.

Do you provide this service for new bridge construction outside Karnataka?

Yes. We've worked on the Bangalore–Chennai Expressway and the Naidupeta–Turpukanpur six-laning in Andhra Pradesh, and on highway work in Tamil Nadu. We consider new bridge construction anywhere in India where the scope and timeline suit our fleet.

What do you need to quote for bridge work?

The general arrangement drawing, soil investigation report, pile schedule or BOQ, site location and your target programme. Email Kavericonstruction22@gmail.com or call +91 84959 52555, Monday to Saturday, 10am to 6:30pm.

Related services

Let’s build together

Have a bridge package to deliver?

Send the drawings, soil report and programme. We’ll review the piling, substructure and equipment requirements for your site.

Discuss your bridge