NH-548B, Murgundi to Chikkodi
60 km
USK Infrastructure · NH
Services · Infrastructure · Roads and highways
Widening, paved shoulders, bituminous and concrete pavement, and the culverts, drains, retaining walls and piled foundations that go with them. We work on NHAI and state highway packages under main contractors, and as main contractor on district and village roads.
A service by Kaveri Constructions, Bengaluru. Used on NHAI, KSHIP and NH-wing packages in Karnataka, Andhra Pradesh and Tamil Nadu.
Overview
Most national and state highway packages are awarded to EPC contractors and concessionaires. They then bring in specialist highway contractors to take defined parts of the work, such as structures, retaining walls or pavement courses, and finish them on programme.
That's the gap our road construction services fill. We work under the main contractor on national and state roads and highways, and take full scope as main contractor on district and village roads. If you're comparing a road construction company in India for part of a package, the corridors below show the work we've done.
Track record
Packages on national and state highways across three states. Kilometre figures are each package's full length; our scope was the part agreed with the main contractor.
60 km
USK Infrastructure · NH
59 km
USK Infrastructure · NH
39.8 km
DRN Infrastructure · KSHIP
35.5 km
DRN Infrastructure · KSHIP
14.2 km
Udayshivakumar Infra / Amrutha · NHAI
13.7 km
APCO Infratech · NHIL
1 km
H.G. Infra Engineering · NHAI
Sunway / RNS Infrastructure · NHAI
RNS Infrastructure · NHAI
Kaveri (main contractor) · KNNL
See the full register on our projects page.
What's included
Take the full scope on a smaller road, or a defined part of a larger package.
Widening existing roads to two-lane and four-lane standard while traffic keeps moving on the old carriageway. Our widening packages range from 14 km on NH-150A at Siruguppa to 60 km on NH-548B.
Paved shoulders laid with the widening, giving slow vehicles and two-wheelers their own space off the main lanes. Four of our two-lane packages were built to this standard.
Dense bituminous macadam (DBM) as the binder course and bituminous concrete (BC) as the wearing course, laid and compacted to MoRTH specifications.
A dry lean concrete (DLC) base with pavement quality concrete (PQC) on top, for sections designed as rigid pavement.
Cross-drainage culverts, roadside drains and retaining walls, including the stretch from Ch. 38+000 to 39+000 on the NH-48 Nelamangala–Tumkur six-laning.
Bored piles up to Ø1500mm for highway bridges, flyovers and interchange ramps, drilled with our own rigs. See our bridge construction services and pile foundation work.
Bituminous roads with stormwater drains for departments, such as the Belura village road in Bidar district, where we were the main contractor for KNNL.
Highway construction, step by step
Most widening packages follow the same order. The gold stages are the ones our road construction services cover.
Survey, land and utilities. The alignment is fixed, land is handed over, and power lines, pipelines and trees are moved out of the widening.
Traffic diversion. One side of the existing road stays open while the other side is widened.
Earthwork and subgrade. The embankment is built up and compacted in layers to design level.
Culverts, drains and retaining walls go in before the pavement.
Our scopeStructure foundations. Bridges, flyovers and interchange ramps are piled and built.
Our scopeSub-base and base. GSB and WMM on flexible sections, or a DLC base on rigid sections; DLC is in our scope.
Surface courses. DBM and BC on flexible sections, or PQC on rigid sections.
Our scopePaved shoulders, crash barriers, signs and lane markings finish the corridor; paved shoulders are in our scope.
The authority's engineer inspects the stretch against the contract before it opens to traffic.
Pavement
A highway is a stack of layers, and each one spreads traffic load a little wider before it reaches the soil. Indian highways are built one of two ways. The gold layers are the ones in our pavement scope.
Layers in our pavement scope
Layer thicknesses come from each road's pavement design, based on expected traffic and the strength of the subgrade.
Lane configurations
| Configuration | What it means | Where we've worked |
|---|---|---|
| Two-lane with paved shoulders | A two-lane carriageway, usually 7m, with a paved shoulder on each side for slow vehicles and two-wheelers. | SH-82 Chintamani–AP border, SH-85 NICE Road–Magadi, NH-150A Siruguppa, NH-150A KB Cross–Chunchanahalli |
| Four-lane with paved shoulders | A divided road with two lanes in each direction and a median between them. | NH-548B Murgundi–Chikkodi |
| Six-laning | Three lanes in each direction, often with service roads and controlled access. | NH-48 Nelamangala–Tumkur, Naidupeta–Turpukanpur |
NHAI and state packages
Most of India's highway development is tendered by NHAI and state agencies such as KSHIP under a few contract types. We've worked under main contractors on each of them.
NHAI or the NH wing pays a fixed price for design and construction.
Our work: NH-150A KB Cross–Chunchanahalli and NH-548B Murgundi–Chikkodi, both on EPC mode.
The authority pays 40% of the cost during construction; the developer funds the rest and is repaid in annuities.
Our work: Bangalore–Chennai Expressway, Package II, where we bored the structure piles.
The national corridor programme, tendered in packages under EPC or HAM.
Our work: two-laning of NH-227, Meensurutti to Chidambaram, Phase I.
State agencies such as KSHIP upgrade state highways, often with multilateral funding.
Our work: SH-82 and SH-85 two-laning with paved shoulders, for KSHIP.
If you're an NHAI construction company with a package to deliver, we can take structures, retaining walls, piling or pavement stretches off your critical path.
Why main contractors bring us in
When a highway construction company brings us onto a package, this is what comes with us.
MAIT HR-180, MAIT HR-130 and SOILMEC SR-30 piling rigs plus a TATA TFC-75 crawler crane, owned rather than hired, so structure foundations start when the programme says.
We've worked under APCO Infratech, H.G. Infra Engineering, USK Infrastructure, DRN Infrastructure, RNS Infrastructure and Udayshivakumar Infra on national and state highway packages.
We've been the specialist under a main contractor and the main contractor ourselves, so we know what each side needs from the other on site.
Inspection records and cube test results arrive with the work, ready for the authority's engineer.
Who does what
Searches for a road construction company in India usually come from one of three needs. Knowing which one you have saves a round of quotes.
This is the highway construction company that holds the NHAI or state contract. It owns the design, the programme and the handover to the authority.
They take defined parts of a package: structures, piling, retaining walls or pavement stretches. That's the role we take on national highway packages.
District roads, village roads and drains, often contracted directly by the department. We do this too, as main contractor on the Belura village road for KNNL.
Quality
We work to MoRTH Specifications for Road and Bridge Works and the applicable IRC codes. Each layer is inspected before the next one goes down, concrete is cube-tested, and the handover file carries the inspection and test records.
FAQ
Road widening, two-lane and four-lane upgrades with paved shoulders, bituminous pavement (DBM and BC), concrete pavement (DLC and PQC), culverts, drains, retaining walls, and piled foundations for highway structures. You can hire us for a full package or a defined part of one.
The firm holding the NHAI contract, either the EPC contractor or the HAM concessionaire, is responsible for design, construction and handover. It usually brings in specialist highway contractors for structures, piling, retaining walls or pavement stretches. That's the role we take on national highway packages.
Check that they own the equipment the work needs, that they've worked under main contractors on similar NHAI or state packages, and that test and inspection records come with the work. Ask for project references you can call.
A highway section with a two-lane carriageway, usually 7m wide, plus a paved shoulder on each side, typically 1.5m, so slow vehicles and two-wheelers can move off the main lanes. The SH-82, SH-85 and NH-150A packages we've worked on were upgraded to this standard.
Dense bituminous macadam (DBM) is the binder course, laid thicker to spread traffic load down to the base. Bituminous concrete (BC) is the thinner wearing course on top, which takes direct traffic and weather.
Flexible (bituminous) pavement is quicker to lay, costs less upfront and is easier to repair. Rigid pavement, with PQC over a DLC base, costs more to build but needs less maintenance under heavy traffic. The project design fixes the choice based on traffic, soil and budget.
Under EPC, NHAI pays the contractor a fixed price to design and build the road, and NHAI collects any tolls. Under the hybrid annuity model (HAM), NHAI pays 40% of the project cost during construction; the developer funds the rest and is repaid through annuity payments, with interest, over the operation period.
It depends on the length, land handover, utility shifting and the monsoon. NHAI and state packages fix a construction period in the contract, and specialist work such as structures and retaining walls is scheduled inside it.
Yes. We were the main contractor on the bituminous road and stormwater drain at Belura village in Bidar district, built for KNNL under the Chulkinala project.
Yes. Our team works out of Bengaluru, and most of our highway packages are in Karnataka, including Kolar, Magadi, Siruguppa, Bellur Cross, Chikkodi and Bidar. We've also worked in Andhra Pradesh and Tamil Nadu.
The chainage, typical cross-sections, drawings, BOQ, material or soil reports where available, and your target programme. Email Kavericonstruction22@gmail.com or call +91 84959 52555, Monday to Saturday, 10am to 6:30pm.
Related services
Piled foundations, substructures and girder work for bridges.
Bored piles Ø500–1500mm in soil and rock, with our own rigs.
Factories, warehouses and PEB civil works with industrial flooring.
Further reading
Work stages, pavement choices and package planning for road and highway projects.
Read the guideSite information, construction stages and quality checks for bored cast-in-situ piling.
Read the guideA practical guide to scope, drawings, approvals and programme before work begins.
Read the guideLet’s build together
Send the chainages, cross-sections, quantities and programme. We’ll review pavement, drainage and supporting civil works.