Krishna River Bridge, Hippargi

Pile foundation works for the bridge across the Krishna River near Hippargi Village on the Jamkhandi–Athani Road.

Client / authority
KNNL
Main contractor
Udayshivakumar Infra Ltd. / Venkateshwar Constructions
Location
Bagalkot District, Karnataka
Kaveri’s scope
River bridge pile boring
Kaveri Groups project image placeholder

Project overview

About the project.

This bridge project is listed in Kaveri Construction’s portfolio under Karnataka Neeravari Nigam Limited (KNNL). The project is located near Hippargi Village in Bagalkot District, along the Jamkhandi–Athani Road. The recorded main contractors are Udayshivakumar Infra Ltd. and Venkateshwar Constructions.

Kaveri’s listed package covers pile boring in soil and hard rock, with pile diameters of 1,000 mm and 1,200 mm. This page focuses on that foundation scope within the larger river bridge project.

Package information

Scope at a glance.

Foundation type
Bored pile foundations
Recorded pile diameters
1,000 mm and 1,200 mm
Work location / alignment
Jamkhandi–Athani Road, near Hippargi Village
Ground conditions in the listed scope
Soil and hard rock

How we approach similar work

A coordinated foundation package.

For a new project, the construction sequence and responsibilities are agreed around its drawings, site conditions and programme.

01

Review the foundation package

Confirm the drawings, pile schedule, ground information and work boundaries with the project team.

02

Plan site access and mobilisation

Coordinate access for boring equipment, material storage, lifting operations and concrete delivery.

03

Carry out the agreed piling works

Organise the boring sequence and foundation activities around the approved project drawings and site instructions.

04

Record and coordinate progress

Maintain the required work records and coordinate completed foundations with the following construction stages.

Let’s build together

Planning a river bridge package?

Send your drawings, soil report and site details. We’ll discuss the piling scope, ground conditions and construction sequence.

Discuss your bridge