NHAI Project
Palamaner, Andhra Pradesh
Bangalore–Chennai Expressway Piling
- Client
- NHAI
- Main Contractor
- APCO Infratech Pvt. Ltd
Featured Works
Explore our work across expressways, bridges, metro infrastructure and deep foundations.
NHAI Project
Palamaner, Andhra Pradesh
Bridge Work
Bagalkot District, Karnataka
Metro Rail
Whitefield, Bengaluru
Bridge Piling
Bengaluru, Karnataka
Comprehensive Track Record
Civil construction packages across roads, bridges, metro rail and public infrastructure.
| No. | Project and scope | Location | Main Contractor | Client / Authority |
|---|---|---|---|---|
| 01 | Construction of bridge at Km 44.70 on Kottapalli–Masti RoadPackage AX, Bridge No. 173. Rotary boring for 1,200 mm diameter piles in soil and hard rock. | Kolar District, Karnataka | BSR Infratech | KRDCL |
| 02 | Two-laning with paved shoulders of Chintamani to AP BorderRoad widening with paved shoulders from km 47.203 to km 86.977 on State Highway 82. | Kolar District, Karnataka | DRN Infrastructure Pvt. Ltd. | KSHIP |
| 03 | Construction of bridge across Krishna River near Hippargi VillageJamkhandi–Athani Road. Boring for piles with diameters of 1,000 mm and 1,200 mm in soil and hard rock. | Bagalkot District, Karnataka | Udayshivakumar Infra Ltd / Venkateshwar Constructions | KNNL |
| 04 | Development of B.T.C.C Road & Drain at Belura VillageBituminous road and stormwater drainage works for the Chulkinala project (ID 29325). | Bidar District, Karnataka | Kaveri Construction | KNNL |
| 05 | Two-laning of Meensurutti to Chidambaram (NH-227)Highway corridor works under Bharatmala Pariyojana Phase I. | Chidambaram, Tamil Nadu | Sunway Construction / RNS Infrastructure Ltd | NHAI |
| 06 | Bridge Construction: Gopalan Arcade to Mysore RoadRR Nagar, Ward 160. Piling at LC No. 40 for MRIDC, including liners and concrete for 1,000 mm and 1,200 mm diameter piles. | Bengaluru, Karnataka | Imperial Constrafin Pvt. Ltd. | BBMP |
| 07 | Two-laning with paved shoulder: NICE Road to MagadiRoad widening with paved shoulders from km 15.325 to km 50.850 on State Highway 85. | Magadi, Karnataka | DRN Infrastructure Pvt. Ltd. | KSHIP |
| 08 | Upgradation of Belakari Port to Kumta–Sirsi RoadCivil works for port connectivity and the road corridor. | Sirsi District, Karnataka | RNS Infrastructure Ltd | NHAI |
| 09 | Widening to 2-lane with paved shoulders, KM 184.70 to 198.92Widening with paved shoulders from km 184.70 to km 198.92 on National Highway 150A. | Siruguppa, Karnataka | Udayshivakumar Infra Ltd / Amrutha Infrastructures | NHAI |
| 10 | 10MLD Sewage Treatment Plant & 13MLD TSPS at KommaghattaDesign, build and operate contract with seven years of operation and maintenance; foundation works using 500 mm diameter piles. | Bengaluru, Karnataka | KBR Infratech Ltd | BWSSB |
| 11 | Metro Line Extension (Reach-1B) & Whitefield Depot Line ExtensionBangalore Metro Phase II piling works, using 1,200 mm diameter piles and polymer tanks. | Bengaluru, Karnataka | M. Venkata Rao Infra Projects Pvt. Ltd. | BMRCL |
| 12 | STPs, Trunk Sewers & Manholes in Byatarayanapura (JICA CP-25)Civil infrastructure for sewage treatment plants, trunk sewers and manholes under JICA package CP-25. | Bengaluru, Karnataka | Passavant Energy & Environment India Pvt. Ltd. | BWSSB |
| 13 | Bangalore–Chennai Expressway Piling Works (Km 96 to 127)Baireddypalle–Bangarupalem package. Piling at km 123+949 and interchange ramps using 1,200 mm and 1,500 mm diameter piles. | Palamaner, Andhra Pradesh | APCO Infratech Pvt. Ltd (AIPL) | NHAI |
| 14 | Retaining Wall at Ch.38+000 to Ch.39+000 in 6-Laning of NH-48Retaining wall works from chainage 38+000 to 39+000 on the Nelamangala–Tumkur bypass section. | T-Begur, Karnataka | H. G. Infra Engineering Ltd. | NHAI |
| 15 | Widening to 2-Lane with Paved Shoulders: KB Cross to ChunchanahalliWidening with paved shoulders from km 485+240 to km 544.200 on NH-150A under an engineering, procurement and construction contract. | Bellur Cross, Karnataka | USK Infrastructure Pvt Ltd | NH |
| 16 | Bridge across Ganeshpal Falls, Hittalahalli VillageBridge works at Hittalahalli Village, Yellapur Taluk, under a turnkey design contract. | Ganesh Pal, Karnataka | BSG Infrastructure Dharwad | KRDCL |
| 17 | Six-Laning of Naidupeta–Turpukanpur Section (Km 78+215 to 91+927)Six-lane highway works from km 78+215 to km 91+927. | Naidupeta, Andhra Pradesh | APCO Infratech Pvt. Ltd | NHIL |
| 18 | Railway Underpass Construction at ChikkabanavaraRailway underpass and approach structure works at Chikkabanavara. | Chikkabanavara, Bengaluru | Parmanand Adwani | MoR (Railways) |
| 19 | Widening to 4-Lane with Paved Shoulders of NH-548B (Km 80 to 140)Four-lane widening with paved shoulders from km 80 to km 140 on NH-548B under the Annual Plan. | Chikkodi, Karnataka | USK Infrastructure Pvt Ltd | NH |
Let’s build together
Share your project drawings, location and construction package. Let’s discuss how our experience fits your requirements.